Lilypie Fourth Birthday tickers
Lilypie Second Birthday tickers

June 26, 2011

Summer Swimming TIme!!

Shane bought the kids a new swimming pool the other day. They have a blast playing in it. Payton is getting to be quite the daredevil in the swimming pool!









Caleb's first shiner

Well it only took 16months of life for Caleb to get his first black eye. We were shopping for furniture for the new house at a place called American Freight. It is like a warehouse full of furniture of all kinds. There are end tables stacked on end tables, coffee tables, couches and all kinds of bedroom furniture (you get the idea right?). We were in the store for about 5minutes when Caleb decided to try and climb up onto one of the glass/rod iron end tables. As he was trying to climb and before Shane or I could get to him the one he was using to pull his weight came crashing to the floor. On the way down, it hit him in the back which knocked him over. He hit his eye on the wooden palate that the furniture was stacked on. Glass shattered every where. It was a mess. Could have been a lot worse so I am thankful that it was only a black eye.




Father's Day 2011

Shane had to work on Father's Day this year so we made a trip to see Nana and Poppy. We got Poppy a card and a key lime pie....his FAVORITE!!! Payton spent the day in the pool (which was freezing because the weather hasn't been that hot.) So we took turns getting in with her. She was jumping and splashing and having a great time, even though her lips were blue!! Caleb splashed a lot but was not too fond of the cold water. After naps, Poppy gave tractor rides and we had dinner. The best part of the whole day was that Payton voluntarily gave up her binky. She just announced that she didn't need it anymore. She has been binky free since!! Here are some pictures from the day.


























June 19, 2011

We have drywall people!!!!

Shane and I went to the house yesterday to find that the entire house has been drywalled. I was not expecting the whole house to be done. I will say it again, it amazes me how much gets done in a week. The outside stone is complete. They only things they have left to do on the outside is put the stone on the bottom portion of the house when the final grading will be. They need to run out faucets and outlets to the outside as well. Moving right along! I was told that a good rule of thumb is that the house will be complete 6 weeks from the drywall stage. If that is the case, we are looking at moving in at the beginning of August, instead of the end. HOLY COW!!! Here are the lastest pictures.



The Garage


Isn't the front beautiful?


Looking up into the loft from the family room.


Laundry Room


Family Room


Kitchen


Dining Room


Living Room


Study/Den/Playroom


Top of Stairs


Upstairs Hallway


Master Shower


Master Bathroom


Master Bedroom


Guest Bathroom


Guest Bedroom


View from the loft


Kid's Bathroom


Bedroom #1


Bedroom #2

June 13, 2011

Floors and insulation

We have a basement floor and a garage floor. Most of the house is insulated already and they have started to put the stone on the front. They have also poured the front porch. It is amazing how much they got done in a week. I am pretty sure they will start drywalling this week. August is going to come so quickly, I can't believe it! Here are the latest photos:











June 5, 2011

2411 Twelve Oaks

Here are the most recent pictures of the house. The updates will be fewer and farther between because they are almost completely done with the external features and the internal features don't change all that quickly. We were there today and it looks as though all of the plumbing is finished (except the well). The electricians have been there and working hard. There is only a few more things it looks like they need to wire. The basement is ready to be poured (they have installed all plumbing needed for the bathroom down there). I am sure it won't be long until they start the insulation and drywall. Enjoy the pictures!