Shane and I went to the house yesterday to find that the entire house has been drywalled. I was not expecting the whole house to be done. I will say it again, it amazes me how much gets done in a week. The outside stone is complete. They only things they have left to do on the outside is put the stone on the bottom portion of the house when the final grading will be. They need to run out faucets and outlets to the outside as well. Moving right along! I was told that a good rule of thumb is that the house will be complete 6 weeks from the drywall stage. If that is the case, we are looking at moving in at the beginning of August, instead of the end. HOLY COW!!! Here are the lastest pictures.
The Garage
Isn't the front beautiful?
Looking up into the loft from the family room.
Laundry Room
Family Room
Kitchen
Dining Room
Living Room
Study/Den/Playroom
Top of Stairs
Upstairs Hallway
Master Shower
Master Bathroom
Master Bedroom
Guest Bathroom
Guest Bedroom
View from the loft
Kid's Bathroom
Bedroom #1
Bedroom #2
June 19, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment